Implementation of a 450 kWp investment consisting of two types of carports: T and 4N, covering a total of 140 parking spaces. The project was carried out on an existing parking lot, where it was crucial to choose a foundation method that would minimally impact the existing infrastructure and allow the parking spaces to be restored for use in the shortest possible time.
⏱️ Czas czytania: 1 min
Each component of the carport structure was protected against corrosion using batch galvanization technology, with continuous monitoring of the zinc bath at TIGA-CYNK Sp. z o.o. in Małomice. As a result, it is possible to provide a 15-year warranty for both the structure and the anti-corrosion coating.










